No. Period Project Name Employer
51 2016.02~2016.08 E&I Work of High-Pressure Gas Compression in Tongyeong Korea Gas Corp Tongyeong Branch
50 2016.02~2016.03 Renovation Work of #1~4HRSG Exhaust Gas Duct Inlet Temp TX SK E&S
49 2016.02~2016.02 Temporary Switch Installation work of Ulsan #4 Combined Power Plant Korea East West Power Co., Ltd.
48 2016.02~2016.02 TC Installation Work of HRSG Tube Temperature Measurement in Ulsan #4 Combined Power Plant Korea East West Power Co., Ltd.
47 2016.02~2016.06 Electric Work of Yeosu Thermal Power Plant's Coal Storage Korea South East Power Co., Ltd.
46 2014.12~2017.01 E&I Work of Yeosu Thermal Power Plant #1 Desulfurizer Korea South East Power Co., Ltd.
45 2014.12~2017.01 Desulfurizer Erection Work in Yeosu #1 Thermal Power Plant Korea Southern Power Co./Halla Energy & Environment Co.
44 2013.12~2014.09 Erection Work of #1,2 Turbine Generator in Samcheok Green Power Plant Korea Southern Power Co.
43 2013.10~2014.11 Instrument Work of Group Energy Supply Project in Daejeon Korea Land&Housing Corp.
42 2013.08~2014.03 Erection Work of IPB & GCB in Dongducheon Thermal Power Plant Dongducheon Dream Power Co.
41 2013.08~2013.08 Temp. Lighting Installation Work for Yeosu #1 Power Plant Construction Korea Southeast Power Co./ POSCO E&C
40 2013.05~2013.07 E&I Work for Coal Feeding System Relocation in Yeosu #2 Power Plant Doosan Heavy Industries& Construction
39 2013.04~2013.07 E&I Work of #2 Coal Storage Conveying System of Donghae Thermal Power Plant Korea Eastwest Power Company/Halla Energy & Environment Co.
38 2013.01~2014.12 E&I Work for #2 District of Dongducheon Thermal Power Plant Project Dongducheon Dream Power Co./ Samsung C&T
37 2013.01~2016.02 Erection Work for Common Electric Facility in Yeosu #1 Thermal Power Plant Project.(CE-03) Korea Southeast Power Co./ POSCO E&C