No. |
Period |
Project Name |
Employer |
51 |
2016.02~2016.08 |
E&I Work of High-Pressure Gas Compression in Tongyeong |
Korea Gas Corp Tongyeong Branch |
50 |
2016.02~2016.03 |
Renovation Work of #1~4HRSG Exhaust Gas Duct Inlet Temp TX |
SK E&S |
49 |
2016.02~2016.02 |
Temporary Switch Installation work of Ulsan #4 Combined Power Plant |
Korea East West Power Co., Ltd. |
48 |
2016.02~2016.02 |
TC Installation Work of HRSG Tube Temperature Measurement in Ulsan #4 Combined Power Plant |
Korea East West Power Co., Ltd. |
47 |
2016.02~2016.06 |
Electric Work of Yeosu Thermal Power Plant's Coal Storage |
Korea South East Power Co., Ltd. |
46 |
2014.12~2017.01 |
E&I Work of Yeosu Thermal Power Plant #1 Desulfurizer |
Korea South East Power Co., Ltd. |
45 |
2014.12~2017.01 |
Desulfurizer Erection Work in Yeosu #1 Thermal Power Plant |
Korea Southern Power Co./Halla Energy & Environment Co. |
44 |
2013.12~2014.09 |
Erection Work of #1,2 Turbine Generator in Samcheok Green Power Plant |
Korea Southern Power Co. |
43 |
2013.10~2014.11 |
Instrument Work of Group Energy Supply Project in Daejeon |
Korea Land&Housing Corp. |
42 |
2013.08~2014.03 |
Erection Work of IPB & GCB in Dongducheon Thermal Power Plant |
Dongducheon Dream Power Co. |
41 |
2013.08~2013.08 |
Temp. Lighting Installation Work for Yeosu #1 Power Plant Construction |
Korea Southeast Power Co./ POSCO E&C |
40 |
2013.05~2013.07 |
E&I Work for Coal Feeding System Relocation in Yeosu #2 Power Plant |
Doosan Heavy Industries& Construction |
39 |
2013.04~2013.07 |
E&I Work of #2 Coal Storage Conveying System of Donghae Thermal Power Plant |
Korea Eastwest Power Company/Halla Energy & Environment Co. |
38 |
2013.01~2014.12 |
E&I Work for #2 District of Dongducheon Thermal Power Plant Project |
Dongducheon Dream Power Co./ Samsung C&T |
37 |
2013.01~2016.02 |
Erection Work for Common Electric Facility in Yeosu #1 Thermal Power Plant Project.(CE-03) |
Korea Southeast Power Co./ POSCO E&C |